EasyManua.ls Logo

Fujitsu PRIMERGY BX900 - Electrical Considerations; Environmental Considerations; Unpacking and Installing the Embedded Switch Module

Fujitsu PRIMERGY BX900
69 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12 Brocade 5450 Hardware Reference Manual
53-1001266-02
Unpacking and installing the Embedded Switch Module
2
Electrical considerations
The Embedded Switch Module requires 35 watts nominal (maximum of 50 watts), provided by the
chassis. No other power requirement or provision exists.
Environmental considerations
Ensure proper cooling and ventilation by verifying the following:
The air vents on the chassis are not blocked or restricted.
The ambient air temperature at the front of the enclosure does not exceed 35º C (95º F) while
the Embedded Switch Module is operating.
Unpacking and installing the Embedded Switch Module
If the Embedded Switch Module is installed in the Blade Server chassis as shipped to you, skip this
section. This section applies when installing a new module in an empty bay or replacing an existing
Embedded Switch Module.
Perform the following steps to remove the Embedded Switch Module from its shipping
package.
1. Open the shipping box and inspect the contents.
Do not insert a damaged Embedded Switch Module into the Blade Server chassis. If the
Embedded Switch Module appears to be damaged, contact your sales representative before
proceeding.
2. Remove the cardboard accessory tray from on top of the Embedded Switch Module.
This tray contains the documentation, regulatory statements, product information guide, and
Documentation CD.
3. Remove the Embedded Switch Module from the box.
The protective foam ends will slide out with the Embedded Switch Module.
4. Remove the foam ends from the Embedded Switch Module.
5. Be sure that you have taken the necessary precautions for electrostatic sensitivity; then break
the seal warning.
6. Slide the Embedded Switch Module out of the antistatic sleeve and inspect it carefully for any
obvious defects or shipping damage.
7. For complete instructions to install the Embedded Switch Module into the Blade Server
chassis, refer to the section on installing an I/O module in the PRIMERGY BX900 S1 Basic Unit
Operating Manual.

Table of Contents

Other manuals for Fujitsu PRIMERGY BX900

Related product manuals