54 Service Supplement RX300 S5
Replacing the UFM board Replacement routines
Ê Connect the new UFM board to the System Board and the remaining UFM
spacer (1).
Ê Secure the UFM board to the UFM spacer with the nylon screw (2).
Ê Reinstall the PSU cage as described in the Option Guide PRIMERGY
RX300 S5 in chapter „completion.
Ê Close the server and reconnect all AC power cords to the system (refer to
the Options Guide for a detailed description).