EasyManuals Logo
Home>Furuno>Marine GPS System>FELCOM 12

Furuno FELCOM 12 Service Manual

Furuno FELCOM 12
118 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #58 background imageLoading...
Page #58 background image
5-1
5.1 PV (Performance Verification) Test
The PV test consists of the message reception test, message transmission test and distress
alert transmission test. The results of the test appear on the PV Test Result display (see
page 5-3).
The MES-originated PV test proceeds in the following sequence.
When an LES originates a test, the test starts from the step 5.
Sequence
1. Select PV test on the Test menu.
2. The MES requests NCS to conduct PV test.
3. The NCS acknowledges request for testing.
4. The MES, upon receiving acknowledgement from NCS, goes into pending state.
5. NCS selects a (not busy) LES to perform the test.
6. The LES transmits a test message to the MES.
7. The MES transmits the test message to the designated LES.
8. The LES receives the test message.
9. Distress alert testing. The MES transmits the distress alert transmission test, either
manually or automatically. (The distress alert is automatically transmitted if it is not
transmitted within two minutes after the completion of step 8.)
10. When the distress alert test is finished the results of the PV test are sent to MES.
Chapter 5 Maintenance

Table of Contents

Other manuals for Furuno FELCOM 12

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Furuno FELCOM 12 and is the answer not in the manual?

Furuno FELCOM 12 Specifications

General IconGeneral
BrandFuruno
ModelFELCOM 12
CategoryMarine GPS System
LanguageEnglish

Related product manuals