EasyManua.ls Logo

GDC SX-2000 User Manual

GDC SX-2000
42 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
GDC Technology Ltd
SX-2000
SERVER INSTALLATION MANUAL
Question and Answer IconNeed help?

Do you have a question about the GDC SX-2000 and is the answer not in the manual?

GDC SX-2000 Specifications

General IconGeneral
BrandGDC
ModelSX-2000
CategoryServer
LanguageEnglish

Summary

Introduction

SX-2000 and Integrated Media Block (IMB) Physical Setup

Server Presentation

Overview of the front and rear panels of the SX-2000 server.

Placing the Server

Guidelines for mounting and positioning the SX-2000 server unit.

Insertion of Drives

Step-by-step instructions for installing hard drives into the server's hot-swap bays.

Cable Connections

Details the essential cable connections required for the SX-2000 server operation.

Installing and Connecting the GDC Integrated Media Block (IMB)

Procedure for installing the IMB into the projector and connecting it to the SX-2000 server.

Installing the IMB into the Projector

Steps for physically installing the IMB within the projector and connecting it.

IMB Components

Identifies the components provided with the GDC Integrated Media Block.

Remove Existing Interface Board/Placeholders from Projector

Instructions for removing interface boards from projectors before IMB installation.

Inserting IMB to the Projector

Guide on how to physically insert the IMB unit into the projector.

Connecting the IMB to the SX-2000 Server

Details the PCI-e and network cable connections between the IMB and SX-2000 server.

Connecting to the IMB and the Projector

Steps for connecting PCI-e and network cables to the IMB on the projector.

Connecting to the SX-2000 Server

Steps for connecting PCI-e and network cables to the SX-2000 server.

Series 2 Projector Setup

Configuration steps for Series 2 projectors to work with the GDC IMB.

Barco Series 2 Projector

Configuration details for Barco Series 2 projectors with the GDC IMB.

NEC Series 2 Projector

Steps for configuring NEC Series 2 projectors using the Digital Cinema Communicator.

Christie Series 2 Projector

Procedure for setting up Christie Series 2 projectors for IMB compatibility.

3D Settings for Christie Series 2 Projectors

Configuration of 3D macros and input settings for Christie Series 2 projectors.

IMB 3D Macro Settings Changes

SX-2000 Server Configuration

SX-2000 Configuration

General configuration steps for the SX-2000 server and its network settings.

Server IP Setup

Instructions for configuring IP addresses for the server's network interface cards (NICs).

IMB and Projector IP Setup

Configuring projector and IMB IP addresses and marriage on the SX-2000 server.

Content Ingest Management Setup

Setting up the server for ingesting content from external sources like USB or FTP.

Content Ingest from USB Disk

Procedure for setting up a USB drive as a content ingest source.

Content Ingest from FTP

Steps for configuring an FTP server as a content ingest source.

Selecting an Ingest Source

How to choose the desired ingest source from the available options.

Time Zone Setup

Instructions on how to change the time zone settings for the SX-2000 server.

Audio Setup

USL ECI-60

Connecting the server's audio output to the USL ECI-60.

Yamaha DA824

Configuring audio connection with the Yamaha DA824.

USL DAX-602

Connecting the server's audio output to the USL DAX-602.

Dolby DMA8

Connecting the server's audio output to the Dolby DMA8.

Dolby CP650 Sound Processor

Connecting the server's audio output to the Dolby CP650.

Automation Setup

General Automation Setup

General steps for setting up an automation device on the SX-2000 server.

Adding Event Labels and Actions

Procedure for adding event labels and associated automation actions.

Automation Scheduling

Scheduling automation events to execute at specific times or intervals.

Automation Setup for Server GPIO

Configuration of GPIO automation device when a GPIO card is installed.

Automation Setup for Projectors

Configuring projector devices (Barco, Christie, NEC) for automation.

Automation Setup for eCNA Devices

Setting up the eCNA-10 automation system within the server interface.

Automation Setup for JNIOR Devices

Configuration of JNIOR Model 310 automation devices in the server interface.

Automation Setup for Christie ACT Devices

Setting up Christie ACT devices for automation within the server interface.

Automation Setup for Dolby CP650 Devices

Configuration of Dolby CP650 sound processor for automation.

Automation Setup for USL DAX Devices

Setting up USL DAX sound processors for automation in the server interface.

Automation Setup for USL JSD Devices

Configuration of USL JSD devices for automation in the server interface.

Component Engineering TA-10 Setup

Setup and wiring for the Component Engineering TA-10 for automation.

Testing Procedures for QC after Installation

Related product manuals