EasyManua.ls Logo

GE Bently Nevada 3300/25 - Conversion Factor Calculation

GE Bently Nevada 3300/25
150 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3300/25 Dual Accelerometer Input Monitor Operation Manual
140
If the transducer signal is simulated by a function generator, Vsig is the peak or
RMS signal level.
2. Calculate the front panel meter reading:
adingReMeterPanelFront=
)Hz(F
K
×Vsig
Where:
'Vsig' is the input voltage to monitor.
'K' is the conversion factor is from the tables below.
'F' is the frequency of the input signal.
'Front Panel Meter Reading' is the value displayed on the front panel.
Scale Factor = 100 mV/g, BB and CC options 5,6,15,16 and 17.
Conversion factor for Conversion factor for
Input measured in output measured in output measured in
in/s (peak) mm/s (peak)
peak
K = 614.48 K = 15,607.77
RMS
K = 869.00 K = 22,072.72
21.3.1 Conversion Factor Calculation
This is how the conversion factor, K, is calculated:
{}{ }
K=
π×2
1
×conversionunits×RMStopeak
{Peak to RMS}:
= 1.414 if input is in RMS
= 1.0 if input is in pk
{Units Conversion}:
for 100 mV/g to in/sec (peak) output:
ft
in12
×
g
174.32
×
V100.0
g
sec
ft
for 100 mV/g to mm/sec (peak) output:
g
7.9806
×
V100.0
g
sec
mm

Table of Contents

Related product manuals