Druck ADTS 2XX User Manual 12
K0451 Issue No. 1
3-2 Power-up routine
{ Set the power supply switch to ON.
{ Check that the screen shows the correct display for a successful power-up.
Check:
{ the pump operates.
{ the power indicator lights
{ air discharges through the water drain.
{ Connect the cable to the AHT communication connector on the ADTS 2XX.
{ Check that the screen shows the correct display.
{ Check that the ADTS 2XX screens show the correct display messages (see below).
Note: This Windows
®
based facility hides many of the normal features of Windows
®
.
FIGURE 3-1 POWER-UP DISPLAYS