EasyManua.ls Logo

GE Giraffe Blue Spot PT Lite - Chapter 7: Installation; 7.1 Time Required for Installation; 7.2 Environmental Requirements; 7.3 Tool Requirements

GE Giraffe Blue Spot PT Lite
96 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 7: Installation
This chapter provides information required to prepare for and perform installation of the Girae Blue Spot
PT Lite.
Upon shipment, the light pipe is detached from the light box. Prior to rst use, the light pipe needs to be
attached and secured to the light box as described in section 7.4.1.
7.1 Time Required for Installation
The average installation time for the Girae Blue Spot PT Lite is about 5 minutes. The required checkout
procedures after installation take approximately 20 minutes.
7.2 Environmental Requirements
The system shall be installed, serviced, and operated within the environmental conditions described in
section 5.2.
7.3 Tool Requirements
The hex key provided with the system (No other tools are required).
47

Table of Contents

Related product manuals