8.3 Tool Requirements
The following table lists the service tools required to perform the planned maintenance and checkout
procedures:
Table 8-2: Tool Requirements
Checkout Procedure Name Service Tools Needed Quantity Needed
“8.4.1 Visual Inspection” None NA
“8.4.2 Functional Checks” None NA
“8.4.3 Light Intensity Check”
BiliBlanket Light Meter II (6600-0198-900),
Tape measure
1
“8.4.4 Electrical Safety Tests” Safety analyzer 1
8.4 Maintenance and Checkout Procedures
NOTE: For instructions on cleaning the unit cover, refer to Chapter 3.
8.4.1 Visual Inspection
1. Disconnect the power cord from the power outlet.
2. Examine the power cord for any signs of damage. Replace the cord if damage is evident and perform
electrical safety test as instructed in section 8.4.4.
3. Check that the power cord retainer is in place.
4. Examine the system overall for any damaged (cracked or broken) or missing parts, such as the plastic
unit cover, standby/on switch, standby/on indicator, over/under temperature indicator, hour meter
display, light pipe, light shade, air lter guard, or potential equalization stud. If any part is damaged or
missing, replace it (Refer to Chapter 11).
5. Examine the air lter for damage or dust. Replace if necessary.
6. Examine the system for any missing or damaged labels. For a list of labels, and for the proper location
of each label, refer to section 12.2.
7. For units on portable roll stand, examine the roll stand for any damaged or missing parts. Check the
wheel locks of the roll stand and conrm that they are functional.
52
Chapter 8: Service Maintenance and Checkout