EasyManua.ls Logo

GE H45601VG - Chapter 2 Site Preparations

GE H45601VG
324 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
D
IRECTION 5813707-100, REVISION 2 VENUE GO™ SERVICE MANUAL
Chapter 2 - Site Preparations 2-1
PRELIMINARY
Chapter 2
Site Preparations
Section 2-1
Overview
2-1-1 Purpose of Chapter 2
This chapter provides the information required to plan and prepare for the setup of a Venue Go™
ultrasound unit. Included are descriptions of the electrical and facility requirements that must be met by
the purchaser. A worksheet is provided at the end of this chapter (see Figure 2-3 on page 2-13) to help
ensure that all the required network information is available, prior to setup.

Table of Contents

Related product manuals