Modifications reserved Page 30/103
OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2
5.6 UNPACKING
Move the equipment in it’s original packing, carton box or wooden case, until the place of installation
and remove the packing and the transport sockets only just before installing the UPS.
Procedure for the unpacking of the
UPS:
1
• Make sure to have sufficient
space around the UPS before you
start unpacking.
• Cut the two straps “A” fixing the
carton box.
2
G
R
A
V
I
T
Y
C
E
N
T
E
R
o
f
of
GRAVITY
CENTER
B
C
LPS33_060-080_S2_Unpacking_GE_02
• Remove package “B”.
• Remove the protection “C” outside
the cabinet and the accessories
bag Remove the protection “C”
outside the cabinet and the
accessories bag.
3
LPS33_060-080_S2_Unpacking_GE_02
D
E
Fig. 5.6-1 LP 33 Series unpacking sequence
• Use a forklift to raise the UPS from
the floor.
• Remove the two wooden plates
“D” by unscrewing bolts “E”.
Included in the delivery you can find the following parts:
• An accessories bag
• Control Bus cables (only for RPA Parallel System)
• CD-ROM connectivity