EasyManua.ls Logo

GE LP 33 Series - Page 46

GE LP 33 Series
103 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Modifications reserved Page 46/103
OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2
LPS33_040-120_RPA connection_GE_02
J4
J3
LP 33 Serie
s
1
P1
P13
P34
P1
J3
P13
J4
P34
LP 33 Serie
s
2
J3
P1
P13
J4
P34
LP 33 Serie
s
3
P34
J4
J3
P1
P13
LP 33 Serie
s
4
Fig. 5.8.7-3 Bus connection RPA Parallel System
Bus connection RPA Parallel System
Connect the control bus cable between the parallel units as indicated in the diagram Fig. 5.8.7-3.
NOTE !
Provide that the connectors J3 and J4 are properly fixed with the included screws.
LPS33_040-120_RPA connection_03
JP1 JP2
JP3
P1
J3
P13
J4
P34
Fig. 5.8.7-4 Connection to board “P34 – Connector adapter RPA“
NOTE !
The jumper JP1 - JP2 - JP3 must be removed only on the intermediate units, where
the connectors J3 and J4 are both inserted.
Do not insert or remove J3 and J4 from the board “P34 - Connector adapter RPA”
when the Parallel System is operating.
NOTE !
Connection and commissioning of an additional UPS to an existing Parallel System,
must be performed by a service engineer from of your Service Centre.