EasyManua.ls Logo

GE PT7800DH2BB - Tools Needed

GE PT7800DH2BB
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
– 12 –
Tools Needed
*To enable service of the upper
oven without removing the
complete wall oven from the
installation.
Phillips head screwdriver or bit
1/4” hex head nut driver or socket
3/8” socket wrench
7 mm socket or wrench
T10 Torx bit
T20 Torx bit
Upper oven door removal tool. WB01X10364 included with replacement door assembly.
Special Tools
No special tools are required to service these units. Upper oven screws are primarily Phillips head, and lower
oven screws are 1/4 in. hex head or T20. The screw mounting the fad board on the lower oven is a T10, and
the LH threaded nut on the convection blade is 3/8 inches.
Service Harness Extension Part #: WX05X24267
$WRROWRDVVLVWWKHXQODWFKLQJRIDORFNHGGRRUFRXOGEHPDGHXSIURPDSLHFHRIVWLȺZLUHDPHWDOFRDW
hanger, or a piece of brazing solder. Be sure to cover with tape to prevent scratching of the door or trim.

Other manuals for GE PT7800DH2BB

Related product manuals