Shenzhen Getech Technology Co.,Ltd
9
(Picture 5-2)
(Picture 5-3)
3) Secure the three sets of remote extruders to the back side of the gantry top profile and
tighten the screws as shown in picture (5-4).
(Picture 5-4)
4) Please place the filament on the roll of filament holder kit first, and then fix the kit to the
top profile of the gantry frame with 2 M3 * 6 screws and 2 T-nuts M3. If you need to replace
the filament roll, just remove the corresponding filament holder kit. A total of 3 sets of
filament holder kits need to be assembled, as shown picture (5-5).