EasyManuals Logo

Getinge Maquet PowerLED II Maintenance Manual

Getinge Maquet PowerLED II
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #16 background imageLoading...
Page #16 background image
4
Maintenance procedures
Periodic maintenance
16 / 56
Maquet PowerLEDII
01810 EN 03
For SB, SA and SAT suspensions
Items Frequency
All brakes Every year
Suspension mounting screws
(tighten the screws to the recommended tight-
ening torque)
Every 6 years
Adapter mounting screws
(tighten the screws to the recommended tight-
ening torque)
Every 6 years
Acrobat 2000 or Ondaspace spring arm snap
ring
Every 6 years
Batteries Every 3 years
For SAX and SATX suspensions
Items Frequency
All brakes Every year
Suspension mounting screws
(tighten the screws to the recommended tight-
ening torque)
Every 10 years
Adapter mounting screws
(tighten the screws to the recommended tight-
ening torque)
Every 10 years
Valia spring arm snap ring Every 10 years
Batteries Every 3 years
4.2.2 Replacing the batteries
WARNING!
Risk of burns
If unsuitable batteries are used, they may explode due to the emission of
gases or liquids.
Always use batteries supplied by Getinge during installation and when repla-
cing defective batteries.
WARNING!
Risk of electric shock or injury
The use of screws or spare parts other than those supplied by the manufac-
turer may damage the device.
Use only screws and spare parts supplied by the manufacturer.

Other manuals for Getinge Maquet PowerLED II

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Getinge Maquet PowerLED II and is the answer not in the manual?

Getinge Maquet PowerLED II Specifications

General IconGeneral
BrandGetinge
ModelMaquet PowerLED II
CategoryMedical Equipment
LanguageEnglish

Related product manuals