EasyManuals Logo

Getinge Maquet PowerLED II Maintenance Manual

Getinge Maquet PowerLED II
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #30 background imageLoading...
Page #30 background image
6
Inspections
Mechanical inspections
30 / 56
Maquet PowerLEDII
01810 EN 03
6 Inspections
6.1 Mechanical inspections
1
1
2
3
Fig.34: Anchor point
Check the tightening of the anchoring and connections on the terminals 2 3 and the con-
nection boxes 1 .
Check the ground connections 2 or 3 .
1
2
3
4
Fig.35: Suspension tube and ceiling cover
Check the rigidity of the suspension by shaking the assembly.
Verify the verticality of the tube.
SAT and SATX tube: Check the tightening of the screws of the half-plates on shafts 2 and 3.
SB tube: Check the tightening of the cover split-rings 4 .
Check that the cover and the retention and upper seals 1 are secure.
Check the resistance of the silicone sleeve 2 and, for the modified SAT tube, the screw
cover labels 3 for shaft 2 and 3.

Other manuals for Getinge Maquet PowerLED II

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Getinge Maquet PowerLED II and is the answer not in the manual?

Getinge Maquet PowerLED II Specifications

General IconGeneral
BrandGetinge
ModelMaquet PowerLED II
CategoryMedical Equipment
LanguageEnglish

Related product manuals