EasyManua.ls Logo

Girard Systems G2000 - Tools Required

Default Icon
65 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
32
Girard Systems © 2005
TOOLS REQUIRED
Electric drill; 1/8", 5/16", 7/16" drill bits (for pilot hole - 1/8" x 8" long)
Open-ended wrenches: 10mm, 17mm, and 19mm
Allen wrenches: 4mm and 5mm
Socket wrench (7/16" deep socket)
Measuring tape
Snap (chalk ) line
Phillips screwdriver
Flathead screwdriver (small)
Keyhole saw
Two (2) tubes silicone
Two (2) ladders
ALL ELECTRICAL WORK MUST CONFORM TO
APPLICABLE ELECTRICAL CODES AND STANDARDS
Turn off power before beginning electrical work.
Refer to your RVs wiring diagram for placement of existing wires before drilling
or beginning awning installation.
Be sure that placement of controls, cables, and/or wires does not impede, crimp,
or otherwise obstruct continuity of electrical current.
Prior to beginning installation sequence and while awning is on the ground, open awning approximately
eight inches (8") using hand crank to confirm awning arm location. (See Fig. 17)
Important Note: When proceeding to Section K, note that each awning arm must have a wall mount
bracket directly behind it for proper mounting.

Related product manuals