EasyManuals Logo

GMI GT series User Manual

GMI GT series
147 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #29 background imageLoading...
Page #29 background image
3-11
OPERATING PROCEDUREUSER HANDBOOK
Press and hold both the LH button and the RH button
simultaneously to proceed with the switch-off sequence.
5. Service Due Date message is displayed with user shut-
down if overdue.
Fig. 3.26 Service Due Date
Fig. 3.27 Switch OFF
Fig. 3.28 Zero Sensors
Service due date is
displayed, as shown in
Fig. 3.26.
The screen, shown in Fig.
3.27, is displayed when the
Service date has expired,
i.e. overdue.
To proceed with the switch-off sequence:
Press and hold both the LH button and the RH button
simultaneously.
3.8 SENSORS ZEROING
Before warm-up is completed, the instrument automatically ensures
that the sensors are zeroed before operation.
The screen shown in Fig.
3.28 is displayed during this
process.

Table of Contents

Other manuals for GMI GT series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GMI GT series and is the answer not in the manual?

GMI GT series Specifications

General IconGeneral
BrandGMI
ModelGT series
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals