EasyManua.ls Logo

Goelst G-Motion - Page 36

Goelst G-Motion
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
32
B1
English
During the next steps these components should not move away from each other.
1. Remove transit packaging.
2. Connecting bridge pre-mounted with screws
in one rail-end.
Do not over tighten the grub screws
as this will deform the rail.
3. Connect to the other rail.
Do not over tighten the grub screws
as this will deform the rail.
4. Connect the pilot-elements with the
U-shaped bridge.
5. Place the overlap carrier.
6. To test the rail, rst slide the pilot runner along the entire rail before placing the
motor-unit.
7. Install and commission rail.
(chapter 2-4)