DC INVERTER MULTI VRF INSTALLATION
124
4.5.4 Installation demonstration
Fig 3
Hoisting the main body of the unit
1. Hoisting the main body
Attach the hoisting stand base to hoisting screw. In order to firm the hoisting stand
base, use nuts with washers on either end of it.(refer to Fig. 1)
2. Please refer to the dimension of ceiling opening on the cardboard for installation
● There is a mark for ceiling opening center on the cardboard.
● There is also a mark for main body center on the cardboard.
● Use screws to fix the installation cardboard on the unit. (refer to Fig.3)
3. Adjust the unit to right installation place.
4. Check if the unit is horizontal.
Inner drainage pump and bobber switch are installed in indoor unit. Check if every
side of the unit is horizontal by water lever. (If the unit slants to opposite direction
towards which coagulate water flows, it will bring malfunction to the bobber switch
and cause water drops. (refer to Fig.2)
5. Unscrew the screws on the cardboard, which can be used for installing front panel.