EasyManua.ls Logo

Gree MULTI VRF SYSTEM II GMV-120WL/A-T

Gree MULTI VRF SYSTEM II GMV-120WL/A-T
86 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
DC INVERTER MULTI VRF SYSTEM II
SERVICE MANUAL
R410A(GC201407-
Π
)
Question and Answer IconNeed help?

Do you have a question about the Gree MULTI VRF SYSTEM II GMV-120WL/A-T and is the answer not in the manual?

Gree MULTI VRF SYSTEM II GMV-120WL/A-T Specifications

General IconGeneral
BrandGree
ModelMULTI VRF SYSTEM II GMV-120WL/A-T
CategoryInverter
LanguageEnglish

Summary

PRODUCT

4 SPECIFICATIONS

Technical specifications including capacity, noise, power, dimensions, and operating ranges.

5 PRODUCT CAPACITY CORRECTION

Methods for adjusting system capacity based on temperature and piping conditions.

6 PRINCIPAL OF OPERATION

Explanation of the VRF system's working principle, refrigerant cycle, and components.

CONTROL

2.1 Control panel

Detailed explanation of the wired controller's buttons, LCD graphics, and display symbols.

4 Debugging Software and Tools

Overview of the GREE commissioning software, connection methods, and required tools.

4.2 Software Installation Process

Detailed steps for installing the GREE commissioning software and its components.

INSTALLATION

2 Outdoor Unit Installation

Procedures for installing the outdoor unit, including checks, site selection, and fixing.

3 Indoor Unit Installation

Instructions for installing various types of indoor units, including electrical connections.

MAINTENANCE

1 Unit Debugging

Comprehensive guide on unit debugging, including preparation, procedures, and status codes.

1.1 Preparation for debugging

Steps to take before starting unit debugging, ensuring correct connections and conditions.

1.2 Debugging Procedures and Status Codes

Detailed debugging steps, status codes, and LED indicator interpretations.

2 Malfunction Lists and Indicators

Information on system malfunctions and how to interpret indicator lights.

3 Troubleshooting Guides

Systematic troubleshooting procedures for common issues and error codes.

Troubleshooting principle

General approach and flowchart for diagnosing and resolving communication malfunctions.

Specific Protection Troubleshooting

Troubleshooting flowcharts for various system protections like high pressure and discharge temperature.

5 Part Removal Procedures

Step-by-step instructions for removing and replacing key components of the VRF system.

5.2 Removal of Major Components

Detailed procedures for removing panels, compressor, blades, valves, and other major parts.

6.1 Vacuum drying for the system

Procedure and requirements for vacuum drying the VRF system's pipelines.

6.2 Fill and charge refrigerant

Steps and calculations for correctly filling and charging the system with refrigerant.

6.3 Airtightness test

Importance and procedure for performing airtightness tests to detect refrigerant leaks.