6. Installation
This section includes information about the installation location
and the environmental conditions. The hydraulic and electrical
connections are described.
6.1 Transport
Unpacking
1. Open the packaging.
2. Carefully remove the device from the box.
3. Retain the original packaging in order to return the device.
4. Check the device(s) for transport damage, especially hoses
and cables.
Fig. 19 Transport protection of OCD-162-60
Transport damages
1. Pack the device with its original packaging.
2. Inform the forwarder of the transport damage.
3. Return the device to the supplier.
6.2 Scope of delivery
One box for the system with cover, hoses and screws and one
box per extension module.
6.3 Mounting
Installation location
For structural and technical safety and optimum operation of the
system, all conditions listed below must be met. Prior to
installation of the system, the operating company must make
sure, that all conditions listed below are met.
The installation location must meet the following conditions:
• It is protected from the sun, frost-proof, well-ventilated and
has sufficient lighting. The system must not be installed
outdoors.
• It meets the conditions specified in section 4.3 Environmental
conditions regarding air temperature, humidity, permissible
component temperature and dilution water quality.
• It has walls and floors, which enable the OCD-162-5, -10
system to be wall-mounted (minimum wall thickness for the
mounting screws 0.1 m) or the OCD-162-30, -60 system to be
floor-mounted.
• It has a power supply connection.
• It has access to the main water line.
• It has a connection for dilution water of drinking water quality,
equipped with a manual isolating valve.
• It has a floor drain for washing away chemicals and a drain for
sample water.
• It has a separate storage room for empty and full chemical
containers.
• It is isolated from other areas with regard to fire protection.
• It is secured against unauthorised access, and meets the
regulations for the prevention of accidents.
• It is not in permanent use by staff.
• Minimum wall thickness (brick/concrete): 0.10 m
• Minimum room height: 2.20 m
• Mounting height: display at eye level
• Minimum distance between injection unit and measuring point:
3.00 m
• Minimum distance between top edge and ceiling: 0.19 m
• Minimum allowance on either side: 0.20 m
• Maximum length of suction hoses: 4.30 m
Fig. 20 Dimensions of OCD-162-5, -10
Warning
Risk of personal injury and damage to equipment as
a result of operating faults due to transport damage.
Do not shake, crush or drop the package.
Do not use a sharp or pointed blade.
Open the packaging and carefully remove the device
from the box.
Do not bend the hoses and cables.
Oxiperm Pro OCD-162-30 and -60 systems must be
transported in an upright position.