EasyManua.ls Logo

Hammer N2-35 - Upper Wheel Maintenance; Upper Wheel Replacement Procedure

Hammer N2-35
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
43
!
!
!
"
#
%
$
"
Bandsaw
N2-35
Replace the drive belt. :
Removing the saw blade See chapter entitled: Saw blade
replacement/tension
1. Open the locking nut until the v-belt moves slightly
away from the drive pulley.
2. Loosen the clamping screw.
Disassembling the lower wheel.
Control: Defect or soiled wheel running surfaces
3. Place the new drive belt on the wheel.
Slide the wheel onto the shaft..
Tighten the clamping screw.
5. Attach the belt to the motor pulley.
Ensure that the belt is seated properly with a few
manual turns!
6. Retensioning the drive belt
Faults
! Nut
" Motor pulley
# Clamping screw
$ Lower wheel
% Drive belt
Attention! Risk of material damage!:
Check the rubber surface of the wheels regularly for damage. In case of excessive wear, the wheels must
be replaced.
Removing the saw blade See chapter entitled: Saw blade
replacement/tension
1. Loosen the clamping screw.
2. Disassembling the upper wheel
3. Slide the wheel onto the shaft.
4. Tighten the clamping screw.
! Clamping screw
" Upper wheel
9.3 Upper wheel - Replace
Fig. 9-3: Disassembling the upper wheel
Fig. 9-2: Replace the drive belt.

Table of Contents

Other manuals for Hammer N2-35

Related product manuals