59
8.4 Replace the key safe parts periodically
Users should replace the parts periodically according to the following table. If the part is abnormal
before the replacing time, it should be replaced immediately.
Term of using (year)
Hydraulic hose for lifting system 1-2
High-
pressure hose, hose for hydraulic
system
2
Inner sealing element, rubber matter of the
hydrulic system
2
8.5 Screw down the wheel retaining nut
Re-tighten the wheel retaining nut after break-in ends. Check and tighten wheel retaining nut
periodically.
Screw down the wheel retaining nut with torque spanner to specified order 45 .
Screw down with 10N.m torque.
Screw down with 80N.m torque.
4
45
2
5
3
1