Programmable Temperature & Humidity Controller
76
- Screen to set relays for operations signals by channel.
1. DI signal - Set max time(M) to maintain relay and output for all DI signals.
2. IS 1 & - As a combined signal, set inner signal to use with inner signal 1 and AND condition, and
operating relay. (For complex conditions such as operation condition of refrigerator is certain SV or lower
and certain PV or lower)
3. Delay signal 1 and 2 - Set a relay to operate when defined delay is elapsed after operation of inner signal 1.
(Units are second and minute for delay signal 1 and 2, respectively).
4. User-defined button - Set a relay for the user-defined button in operation screen.
5. IS 9 & - As a combined signal, set inner signal to use with inner signal 9 and AND condition, and
operating relay.
6. Delay signal 3 and 4 - Set a relay to operate when defined delay is elapsed after operation of inner
signal 9. (Units are second and minute for delay signal 3 and 4, respectively).
▶ Other signals
Fig. 131) DO - Other signals