EasyManua.ls Logo

Hettich EBA 20 - Functional Check After a Repair

Hettich EBA 20
31 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
20/31
8 Functional check after a repair
After a repair a functional check of the unit must be carried out. For functional check a
test run with the loaded rotor must be performed.
During the test run the followings must be checked:
Function of the keys and the display.
Run-up and slow-down time, max. speed of the rotor. Values see operating
instructions chapter "Anhang/Appendix, Rotoren und Zubehör/Rotors and
accessories".
Sample temperature. Values see operating instructions chapter "Anhang/Appendix,
Rotoren und Zubehör/Rotors and accessories".
Imbalance switch-off (only with EBA 20 C). Values see chapter "Imbalance switch-
off (only with EBA 20 C)".
Current consumption. Values see chapter "Technical specification".
After the test run a safety test must be carried out. Check the following values:
Insulation resistance
> 2 M
Protective conductor resistance
< 0.2
Leakage current
< 3.5 mA *
* limit according to EN 61010-1
A laboratory centrifuge do not belong to those medical appliances which may be tested
according to the regulation IEC 60601-1 or corresponding national medical electronic
standards. Laboratory centrifuges are classified as laboratory equipment.
The regulations applying to laboratory equipment are IEC 61010-1 or European
standard EN 61010-1.

Related product manuals