EasyManua.ls Logo

Hitachi RAS-(4-6)HVRNS2E - Removing High Pressure Switch and Pressure Switch for Control

Hitachi RAS-(4-6)HVRNS2E
488 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10 Servicing
404
SMGB0064 rev.0 - 08/2011
7 Remove push nuts A and B which xes the compressor. Lift the compressor and remove from the unit body. (C in the
gure does not have a push nut).
a. Check if the Faston terminal has any abnormality when replacing the compressor. (Ensure the pull out force greater
than 20 N)If the Faston terminal is identied faulty replace to a new one.
b. Ensure the xture of the lead wires.
1
1
2
2
3
4
5
6
7
1. Compressor.
2. Accumulator.
3. Push nut.
4. Vibration-proof rubber.
5. Two push nuts.
6. Three vibration-proof rubber.
7. Accumulator.
Removing high pressure switch and pressure switch for control
1 Remove the pipe cover following Removing pipe cover, see on page 401.
2 Remove three (3) xing screws and remove the upper cover.
3 Remove the front cover following Removing front cover, see on page 401.
4 Collect the refrigerant from the check joint.
5 Disconnect the Faston Terminals.
6 Remove the high pressure switch and the pressure switch for control from the brazed part of discharge piping.

Table of Contents

Related product manuals