10 Servicing
412
SMGB0064 rev.0 - 08/2011
Removing electrical box
1 Remove the service cover following Removing service cover, see on page 408.
2 Remove the upper cover following Removing upper cover, see on page 409.
3 Remove four (4) screws which x the electrical box.
4 Pull up and remove the electrical box.
1. Electrical box.
2. Upper cover.
3. Compressor.
N O T E
• Wiring must be removed to dismount the electrical box.
1. Remove the 4-way valve coil from the 4-way valve. : Removing four-way valve coil, see on page 416.
2. Remove the expansion valve coil from the expansion valve. : Removing electronic expansion valve coil,
see on page 417.
3. Remove the solenoid valve coil from the solenoid valve. : Removing solenoid valve coil (20A), see on page 418.
4. Remove the Faston terminals of high pressure switch and the pressure switch for control from the switch
body.
5. Remove connectors on the control PCB.
- THM7 (Outdoor Air).
- THM8 (Piping).
- THM9 (Compressor-top).
- PCN5 (Crankcase Heater).
6. Remove connectors on the DIP-IPM CN202
7. Remove the compressor power wire from the compressor.
8. To remount the electrical box attach the electrical box tting with the partition plate.
(Insert the radiation n into the U-notch on the partition plate and place the n on the fan box side. Then
attach the electrical box hooking onto the partition plate).
Correct installation Fan Box
1. Partition Plate.
2. Place the electrical box onto the front
fold of the partition plate (see correct ins-
tallation).
1. Place to hook the part onto the partition
plate.
1
2
3