EasyManua.ls Logo

Honeywell HON COCON 13 - Operation; Before Getting Started; Leakage Test and Setup; 1- Slam Shut Valve

Honeywell HON COCON 13
31 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operators manual
© 2017 Honeywell International Inc.
Operators manual underground gas pressure reducing station
Type: HON COCON 13
Page 23
4.3Operation
4.3.1Beforegettingstarted
1 Checkiftheupstream&downstreamblockvalvesareclosed.
2 Checkifthesystembetweentheblockvalvesisdepressurized.
3 Assurethattheupstreampiping&equipmenthavebeencleaned.
4 AssurethatboththeinsideoftheHONCoconbodyand
theHONCoconcartridgehavebeencheckedfor
propercleaning,anydamageandsufficientgreasing.(especiallynearsealarea's)

5 Checkinletheader,cartridgeretentionboltsforpropertightening.
6a Presetthereliefvalvebyfullyturninginward(CW)thepressureadjustingscrew.(ifapplicable)
6b Checkiftheuppertrip
valueoftheslamshuthasbeenset,otherwiseturntheadjustmentscrewfullyinward
(CW).
6c Checkifthelowertripvalueoftheslamshuthasbeenset,otherwiseturntheadjustmentscrewfully
outward(CCW)

7 Relaxpressurespringofpilotregulator(s)byfullybackingoutthe
adjustscreworremovalofthecap,spring
cupandspring.
8 Providethedischargelineofthereliefvalvewithanopeningindicator(eg.bysubmergingatubeinwater)
9 Checkifboththepurgevalvesareclosed
4.3.2Leakagetest& Setup
4.3.2.1Slam
ShutValve
Startat4.3.1(firsttimeonly)
1 Closetheisolationvalves.
2 Closethessdvalvebyusingthemanualoverride(pushtheemergencybutton).
3 Open&closeboththepurgevalvestodepressurizethemodule.
4 Failtheregulatoropenbyadvancingtheadjustscrews(CW)
untilalittlespringtensionbuildsup.

5 Checktheupstream&downstreampressuresonthegaugesprovidedforlockupofblockvalves.
6 CracktheupstreamblockvalveandtheupstreamisolationvalveoftheHONCocon.
7 Checkthedownstreampressureforlockup.
8 Relatchthessdcontroller,
enableresetbypresettingthedownstreampressureabovethelowertripvalueof
theSSVbyadvancingtheadjustscrew(CW)oftheregulatorpilot.
9 DecreasethedownstreampressuretothedesiredlowertripvalueoftheSSV(openthepurgevalve)by
backingouttheadjustscrew(CW)of
theregulatorpilot.
10 Slowlyincreasethetrippressurespringtensionofthessdvalvebyadvancingtheadjustscrewofthe
controller(CW)untilthetripmechanismisactivated.
11 Relatchthessdcontroller(takenoteoftheminimalrelatchingdifferential)byfirstadvancingtheadjust
screwofthe
regulatorpilotandthenincreasingthedownstreampressure,closethepurgevalve.Equalize
pressureovertheclosingmemberbyusingthebuiltinbypass(pushtheresetbuttonaspreviously
described)FinallyrelatchtheSSVbypushingthebuttonallthewaytoitsstop(pushtwice)
12 Recheckthe
lowertrippressureandfineadjustifnecessarybyrepeatingactions9to11
13 IncreasethedownstreampressuretothedesireduppertripvalueoftheSSV(donotopenthepurgevalve)
byadvancingtheadjustscrew(CW)oftheregulatorpilot.
14 Slowlydecreasethetrippressure
springtensionofthessdvalvebybackingouttheadjustscrewofthe
controller(CCW)untilthetripmechanismisactivated

Related product manuals