EasyManuals Logo

Honeywell IFP-2100ECS User Manual

Honeywell IFP-2100ECS
264 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #210 background imageLoading...
Page #210 background image
Model IFP-2100/ECS Installation Manual LS10143-001SK-E
11-17
11.9.0.2 Configuration
1. The ECS-NVCM Select Switches need to be programmed for network paging.
Program the switches to select one or more panels as destination panels.
Each switch can only be programmed for either output group activation or network
paging activation.
2. To use network paging: Cue the microphone and press the Select Switch(es) that correspond to the panel(s)
desired to receive network paging
Only one panel can source network paging at a time. The first panel to activate net-
work paging is the source until that panel discontinues use of network paging
3. The panel that is the Network Paging source will continue to play any alarms that are active as long as the
alarm circuits aren't outputting the microphone page

Table of Contents

Other manuals for Honeywell IFP-2100ECS

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Honeywell IFP-2100ECS and is the answer not in the manual?

Honeywell IFP-2100ECS Specifications

General IconGeneral
BrandHoneywell
ModelIFP-2100ECS
CategoryConference System
LanguageEnglish

Related product manuals