CHAPTER 3: UNPACKING
17 63-4528-04
Frame E
Crate (HCRDXXXXXD1000T)
1. Loosen all the screws on the four iron plates at the four
bottom corners of the crate. Four screws are on each of
the iron plates.
2. Remove the crate cover, EPEs, rubber and manual.
3. Loosen the 10 screws on the pallet, then remove the
wooden plate.
4. Lift the drive by hooking the lifting holes. It is now ready
for installation.