EasyManua.ls Logo

HPE ProLiant DL320 Gen11 - Page 155

HPE ProLiant DL320 Gen11
263 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8. Install the access panel.
9. Install the server into the rack.
10. Connect all peripheral cables to the server.
11. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
12. Power up the server.
Removing and replacing a type-p storage controllerRemoving and replacing a type-p storage controller
PrerequisitesPrerequisites
Before you perform this procedure, make sure that you have a T-10 Torx screwdriver available.
About this taskAbout this task
CAUTION:CAUTION:
A discharge of static electricity from a finger or other conductor might damage system boards or other static-sensitive
devices. To prevent damage, observe antistatic precautions.
HPE ProLiant DL320 Gen11 Server Maintenance and Service Guide 155

Table of Contents

Other manuals for HPE ProLiant DL320 Gen11

Related product manuals