EasyManua.ls Logo

HPE ProLiant ML110 Gen11

HPE ProLiant ML110 Gen11
217 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing an accelerator option in the riser cageInstalling an accelerator option in the riser cage
PrerequisitesPrerequisites
Before installing an accelerator option, observe the following:
Review the Accelerator installation guidelines.
Make sure that you have a T-15 Torx screwdriver available.
If you are installing the L4 Tensor Core graphic accelerator, the accelerator support option kit is required (P66618-B21).
The L4 Tensor Core graphic accelerator support option kit includes one PCI air baffle and 15 DIMM blanks.
About this taskAbout this task
CAUTION:CAUTION: To prevent improper cooling and thermal damage, do not operate the server unless all PCIe slots have either a
riser slot blank or an expansion card installed.
CAUTION:CAUTION: A discharge of static electricity from a finger or other conductor might damage system boards or other static-
sensitive devices. To prevent damage, observe antistatic precautions.
ProcedureProcedure
1. Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Disconnect all peripheral cables from the server.
4. Do one of the following:
If the server is in tower mode, place the server on a flat, level surface with the access panel facing up .
If the server is in rack mode, remove the server from the rack.
5. Remove the access panel .
6. Remove the system air baffle.
HPE ProLiant ML110 Gen11 Server User Guide 146

Table of Contents

Related product manuals