EasyManua.ls Logo

HPE ProLiant ML110 Gen11

HPE ProLiant ML110 Gen11
217 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing a serial portInstalling a serial port
PrerequisitesPrerequisites
Before you perform this procedure, make sure that you have the following items available:
Hex screwdriver
Spudger or any small prying tool
About this taskAbout this task
CAUTION:CAUTION:
The port blank provides EMI shielding and helps maintain proper thermal status inside the server. Do not operate the server
when a port blank is removed without the corresponding I/O port option installed.
CAUTION:CAUTION: A discharge of static electricity from a finger or other conductor might damage system boards or other static-
sensitive devices. To prevent damage, observe antistatic precautions.
ProcedureProcedure
1. Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Disconnect all peripheral cables from the server.
4. Do one of the following:
If the server is in tower mode, place the server on a flat, level surface with the access panel facing up .
If the server is in rack mode, remove the server from the rack.
5. Remove the access panel .
6. Remove the system air baffle.
7. If installed, remove the riser cage.
HPE ProLiant ML110 Gen11 Server User Guide 162

Table of Contents

Related product manuals