12. If you are installing the second 4 LFF non-hot-plug drive cage option, repeat steps 10 to 12 on the Box 2.
13. Connect the non-hot-plug drive cables .
14. Make sure that all the system cables that are routed through the front cable channel are properly secured in the metal cable tabs and
cable clamps.
15. Install the system air baffle .
16. Install the access panel .
17. Do one of the following:
Orient the server back to tower mode.
Install the server into the rack.
18. Install the front bezel .
19. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
20. Power up the server.
ResultsResults
The installation is complete.
Installing the 4 LFF hot-plug drive cage optionInstalling the 4 LFF hot-plug drive cage option
PrerequisitesPrerequisites
Before you perform this procedure, make sure that you have a T-15 Torx screwdriver available.
About this taskAbout this task
The server supports the 4 LFF hot-plug drive cage option. This option: