MINIKEY User Manual Change print settings
Page 47 of 66 HSA SYSTEMS
How to test your equipment
When the MINIKEY is being installed, you can check that all hardware connected to
the controller is working as expected.
Select Test I/O in the settings menu. Shortcut “5”
On this screen you will find the start switch, the encoder plus the input and output
channels.
When a signal is ON, the light bulb will light up.
Example:
Activate your start switch. If the controller receives a signal from the start switch, the
light bulb will light up. Start your conveyor. If the controller receives a signal the
lightbulbs "encoder a" and "encoder b" will start flashing.
Press “1” or “2” to toggle the output signals