NOTE
The 180 W PoE midspan is not included in the installation accessory package and needs to be purchased
separately.
Procedure
Step 1 Place the rear panel of the 180 W PoE midspan in front of the DIN rail and ensure that the
DIN rail fits in between the fixture near the top of the PoE midspan and the spring latch near
the bottom.
Step 2 Make the PoE midspan incline forward with the bottom away from the DIN rail, and place the
fixture at the rear of the PoE midspan on the top of the DIN rail.
Step 3 Slowly push the PoE midspan toward the DIN rail to make the spring latch at the rear of the
PoE midspan move down. The spring latch then bounces back to fix the PoE midspan on the
DIN rail.
NOTE
If the spring latch is too tight to move down, you can pull down the spring latch during the installation.
----End
Huawei AR500&AR530&AR550 series Industrial Switch
Routers
Hardware Installation and Maintenance Guide
5 Installing an AR550 Series Industrial Switching Router