AR530
Series
INFRARED
PWR
RUN/ALM
RS485-0
RS485-1
AR531-F2C-H
1
2
----End
4.3 Scenario 3: Mounting the Router in a Cabinet (Using a
530 Horizontal Rack-Mounting Kit)
Context
NOTICE
There must be a clearance larger than or equal to the router's width at the left and right of the
router after the installation. The clearance above the router must be at least two times the
router's height and the clearance below the router must be greater than or equal to the router's
height.
Make sure the following prerequisites are met before the installation:
Huawei AR500&AR530&AR550 series Industrial Switch
Routers
Hardware Installation and Maintenance Guide
4 Installing an AR530 Series Industrial Switching Router
Issue 05 (2015-12-01) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
48