EasyManua.ls Logo

Huawei FusionModule5000

Huawei FusionModule5000
198 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
FusionModule5000 Smart Modular Data Center
Maintenance Guide (ECC800)
5 Parts Replacement
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
169
1. Clamp the power connector to the guide rail of the holder.
2. Install the holder cover using three M4x12 screw assemblies.
Figure 5-67 Assembling a pad power connector holder (BOM number: 14190892)
Figure 5-68 Assembling a pad power connector holder (BOM number: 14190242)
Step 5 Connect cables from the power connector to the AC actuator, and route the cables, as shown
in the following figures.

Table of Contents

Other manuals for Huawei FusionModule5000

Related product manuals