EasyManua.ls Logo

Huawei LUNA2000-200KTL-H1 - Installation Guide; Installation Modes and Site Requirements

Huawei LUNA2000-200KTL-H1
105 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 Installation
4.1 Installation Modes
The Smart PCS can be installed on a support, wall, or DC LV Panel (also referred
to as DCBOX).
Table 4-1 Installation modes
Installation
Mode
Screw Specications Description
Wall
mounting
M12x60 stainless steel expansion bolt Prepared by the
customer
Support
mounting
M12 bolt assembly Prepared by the
customer
DCBOX
mounting
- Purchased from
the Company
4.2 Installation Requirements
4.2.1 Site Selection Requirements
Do not install the Smart PCS in working or living areas to avoid personal
injury or property loss caused by accidental contact by non-professionals or
other reasons during device operation.
Do not install the Smart PCS in noise-sensitive areas (such as residential
areas, oce areas, and schools) to avoid complaints. If the preceding areas
are unavoidable, the distance between the installation position and noise-
sensitive areas must be greater than or equal to 40 m.
If the equipment is installed in a place with abundant vegetation, in addition
to routine weeding, harden the ground underneath the equipment using
cement or gravel (the area shall be greater than or equal to 3 m x 2.5 m).
LUNA2000-200KTL-H1 Smart Power Control System
User Manual 4 Installation
Issue 08 (2024-01-23) Copyright © Huawei Technologies Co., Ltd. 27

Table of Contents

Related product manuals