Figure 4-17 Installing the Smart PCS
NO TE
After the Smart PCS is secured, you need to congure a DC power distribution cabinet by
yourself. For details about the specications, contact local technical support engineers.
----End
4.8 DCBOX Mounting
Installation Description
The DCBOX-9/5-H0 is purchased from the Company.
For details about the installation procedure, see the DCBOX DC LV Panel
User Manual.
NO TE
A maximum of ve Smart PCSs can be installed on the top of the DCBOX. If less
than ve Smart PCSs will be installed, install them from left to right. Otherwise,
the Smart PCS fasteners cannot be used.
The installation method of all Smart PCSs is the same. Install the Smart PCS
according to the direction shown in the gure. This section uses one Smart PCS as
an example.
LUNA2000-200KTL-H1 Smart Power Control System
User Manual 4 Installation
Issue 08 (2024-01-23) Copyright © Huawei Technologies Co., Ltd. 42