Figure 10-2 Installing a new fuse
----End
Follow-up Procedure
Step 1 Power on the system. For details, see the power-on section in the ESS user
manual.
Step 2 Check the running status of the system and ensure that the functions are restored.
----End
LUNA2000-200KWH-2H1 Smart String ESS
Maintenance Manual 10 Replacing a Fuse
Issue 02 (2023-02-28) Copyright © Huawei Digital Power Technologies Co., Ltd. 107