EasyManua.ls Logo

Huawei LUNA2000-200KWH-2H1 - Powering off a Single ESS; Sending a Shutdown Command on the Smartlogger; Power-Off Process

Huawei LUNA2000-200KWH-2H1
171 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Insulated shoes Reective vest
Safety helmet Safety harness
Medical kit
- - -
2.2 Powering O a Single ESS
2.2.1 Sending a Shutdown Command on the SmartLogger
Step 1 Log in to the SmartLogger WebUI, choose Overview > , and click to send
a batch shutdown command to the ESSs connected to the same DC bus.
Figure 2-1 Batch shutdown of the ESSs connected to the same DC bus
Step 2 Click Monitoring and check that the indicators for the PCS, ESC, and ESR are
yellow or gray.
----End
2.2.2
Power-O Process
Table 2-1
Power-o procedure
Step
Item Remarks
1 Powering
o the AC
side of the
Smart PCS
Powering o the battery side
of the AC power distribution
cabinet
As shown by (1) in Figure
2-2.
LUNA2000-200KWH-2H1 Smart String ESS
Maintenance Manual 2 Routine Maintenance
Issue 02 (2023-02-28) Copyright © Huawei Digital Power Technologies Co., Ltd. 22

Table of Contents

Other manuals for Huawei LUNA2000-200KWH-2H1

Related product manuals