EasyManua.ls Logo

Huawei LUNA2000-200KWH-2H1 - 25 Replacing an I;O Expansion Board

Huawei LUNA2000-200KWH-2H1
171 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
25 Replacing an I/O Expansion Board
Context
Figure 25-1 Position of the I/O expansion board
Fault locating:
a. Log in to the SmartLogger WebUI, CMU WebUI, FusionSolar app, or
management system to view alarm information.
b. Refer to the alarm handling suggestions in the alarm list.
Tools: Phillips insulated torque screwdriver, insulated torque socket wrench
Power-o:
a. Log in to the SmartLogger WebUI, CMU WebUI, FusionSolar app, or
management system and send a shutdown command to the rack
controller.
b. Turn o the ESS output DC switch 1Q2.
c. Turn o the ESS battery rack DC switch 1Q1.
LUNA2000-200KWH-2H1 Smart String ESS
Maintenance Manual 25 Replacing an I/O Expansion Board
Issue 02 (2023-02-28) Copyright © Huawei Digital Power Technologies Co., Ltd. 147

Table of Contents

Other manuals for Huawei LUNA2000-200KWH-2H1

Related product manuals