EasyManua.ls Logo

Huawei LUNA2000-200KWH-2H1 - 8.4 Installing Rack Controller Cables

Huawei LUNA2000-200KWH-2H1
241 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NO TICE
If a PSU is damaged, contact the local oce.
Do not put your hands into the PSU slot to avoid electric shock.
In an outdoor scenario, you are advised to power on the PSU within 24 hours
after unpacking. If the PSU cannot be powered on in time, place it in a dry
indoor environment without corrosive gas.
Procedure
Step 1 Push the locking latch leftwards.
Step 2 Pull out the handle.
Step 3 Gently push the PSU into its slot along the guide rails.
Step 4 Push the handle upwards.
Step 5 Push the locking latch rightwards to lock the handle.
Figure 9-1 Installing the PSU
----End
9.3 Power-On Process
D ANGER
Wear insulated gloves and use insulated tools to prevent electric shocks or short
circuits.
LUNA2000-200KWH-2H1 Smart String ESS
User Manual 9 System Power-On
Issue 03 (2023-03-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 121

Table of Contents

Other manuals for Huawei LUNA2000-200KWH-2H1

Related product manuals