● If a PSU is damaged, contact the local oce.
● Do not put your hands into the PSU slot to avoid electric shock.
● In an outdoor scenario, you are advised to power on the PSU within 24 hours
after unpacking. If the PSU cannot be powered on in time, place it in a dry
indoor environment without corrosive gas.
Procedure
Step 1 Push the locking latch leftwards.
Step 2 Pull out the handle.
Step 3 Gently push the PSU into its slot along the guide rails.
Step 4 Push the handle upwards.
Step 5 Push the locking latch rightwards to lock the handle.
Figure 9-1 Installing the PSU
----End
9.3 Power-On Process
Wear insulated gloves and use insulated tools to prevent electric shocks or short
circuits.
LUNA2000-200KWH-2H1 Smart String ESS
User Manual 9 System Power-On
Issue 03 (2023-03-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 121