Figure 9-2 Power-on process
9.4 Powering on the SACU
Prerequisites
The check before power-on has been completed.
Operators have worn PPE.
Ensure that the power voltage of the SACU is within the operating voltage
range, and the three-phase input voltage is within the operating voltage
range of the MBUS CCO.
Procedure
Step 1 Turn on the single-phase power switch that controls the power supply from the
remote transformer station to the SACU.
Step 2 Turn on the three-phase power switch that controls the power supply from the
remote transformer station to the SACU.
If the SACU supports the access of one MBUS route, turn on the
corresponding three-phase power switch.
If the SACU supports the access of two MBUS routes, turn on the
corresponding three-phase power switches.
Step 3 Check that the input voltages of all switches of the SACU are within the operating
voltage ranges using a multimeter.
Step 4 Turn on the QF03 single-phase input switch in the SACU.
Step 5 Turn on the three-phase input switch on the SACU.
LUNA2000-200KWH-2H1 Smart String ESS
User Manual 9 System Power-On