● Four persons or appropriate transportation tools are required to move the
device.
● Place a foam pad or cardboard under the device to protect its enclosure from
damage.
● Use the lifting handles to facilitate installation. The lifting handles are not
delivered with the equipment, but are optional and placed in the tting bag.
Ensure that the lifting handles are securely installed. After the installation is
complete, remove the lifting handles and keep them properly.
● Secure the lifting handles (with the steel washers of the lifting handles closely
tted to the device).
● If the stud of a lifting handle is bent, replace the lifting handle in time.
● Slowly and steadily hoist, land, and move the Smart PCS to avoid bumping and
damaging the device enclosure.
Method
If the installation position is too high to directly install the Smart PCS on the
mounting bracket, you can use a crane to hoist the Smart PCS. Run a sling (strong
enough to bear the weight of the Smart PCS) through the two lifting eyes to hoist
the Smart PCS.
Table 4-3 Method description
Method
Tool Description
Manual
handling
Lifting handles Purchased from
the Company
Hoisting
Crane sling
[1]
Prepared by the
customer
Note [1]: The hoisting capability of the crane shall be greater than or equal to 3
t, the working radius shall be greater than or equal to 2 m, and the length of
the lifting sling shall be greater than or equal to 1.8 m. To prevent damage to
the device surfaces, you are advised not to use metal slings such as steel wire
ropes.
Hole Description