Operation Instructions for TCX56/57 Tire Charger
48
Step down partially on the pedal to inate tire and seal beads with ination hose. Frequently
stop to check bead seating pressure on gauge.
Do not exceed tire manufacturer’s maximum pressure as stated on the sidewall of
the tire when seating beads.
WARNING
Reinstall valve stem core into the valve stem after beads have been seated, and then inate
tire to vehicle manufacturer recommended pressure.
WARNING
Activate air inflation jets only when sealing bead.
Bleed air pressure from system before disconnecting supply line or other pneumatic
components. Air is stored in a reservoir for operation of ination jets.
Only activate the air inflation jets if the rim securing device is locked in place and the
tire is properly clamped.
WARNING
Never mount a tire to a rim that is not the same diameter (e.g., 16 1/2 inch tire
mounting on a 16 inch rim).
WARNING
If tire is over-inated, air may be removed from the tire by pressing the brass manual air
release button located below the air pressure gauge.
Disconnect ination hose from valve stem.
2.9 Removal of Wheel from Tire Changer
Lift the clamping pedal to release the rim from the clamping device.