Table 18. C1001F00 to C1645300 checkpoints (continued)
v If the system hangs on a progress code, follow the suggested actions in the order in which they are listed in
the Action column until the problem is solved. If an action solves the problem, you can stop performing the
remaining actions.
v See Chapter 3, “Parts listing, Type 8406,” on page 229 to determine which components are CRUs and which
components are FRUs.
Progress code Description Action
C1009x46 Processor AVP initialization step in
progress
1. Go to “Checkout procedure” on page 184.
2. Replace the system-board, as described in
“Replacing the FRU system-board and
chassis assembly” on page 260.
C1009x48 Processor flush IPL step in progress
1. Go to “Checkout procedure” on page 184.
2. Replace the system-board, as described in
“Replacing the FRU system-board and
chassis assembly” on page 260.
C1009x4C Processor wiretest IPL step in progress
1. Go to “Checkout procedure” on page 184.
2. Replace the system-board, as described in
“Replacing the FRU system-board and
chassis assembly” on page 260.
C1009x50 Processor long scan IPL step in progress
1. Go to “Checkout procedure” on page 184.
2. Replace the system-board, as described in
“Replacing the FRU system-board and
chassis assembly” on page 260.
C1009x54 Start processor clocks IPL step in
progress
1. Go to “Checkout procedure” on page 184.
2. Replace the system-board, as described in
“Replacing the FRU system-board and
chassis assembly” on page 260.
C1009x58 Processor SCOM initialization step in
progress
1. Go to “Checkout procedure” on page 184.
2. Replace the system-board, as described in
“Replacing the FRU system-board and
chassis assembly” on page 260.
C1009x5C Processor interface alignment procedure
in progress
1. Go to “Checkout procedure” on page 184.
2. Replace the system-board, as described in
“Replacing the FRU system-board and
chassis assembly” on page 260.
C1009x5E Processor AVP L2 test case in progress
1. Go to “Checkout procedure” on page 184.
2. Replace the system-board, as described in
“Replacing the FRU system-board and
chassis assembly” on page 260.
C1009x60 Processor random data test in progress
1. Go to “Checkout procedure” on page 184.
2. Replace the system-board, as described in
“Replacing the FRU system-board and
chassis assembly” on page 260.
C1009x64 Processor enable machine check test in
progress
1. Go to “Checkout procedure” on page 184.
2. Replace the system-board, as described in
“Replacing the FRU system-board and
chassis assembly” on page 260.
88 Power Systems: Problem Determination and Service Guide for the IBM Power PS700 (8406-70Y)

Table of Contents

Other manuals for IBM Power PS700

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM Power PS700 and is the answer not in the manual?

IBM Power PS700 Specifications

General IconGeneral
BrandIBM
ModelPower PS700
CategoryServer
LanguageEnglish

Related product manuals