Do you have a question about the IBM SAN Volume Controller 2145-SV1 and is the answer not in the manual?
Describes the controls and indicators on the front panel of the 2145-SV1 node.
Explains the buttons and LEDs on the 2145-SV1 operator-information panel.
Details the LEDs on the rear panel indicating status of ports, power, and connection.
Outlines the necessary preparations for installing SAN Volume Controller hardware.
Details the tasks involved in installing the SAN Volume Controller 2145-SV1 node.
Describes the procedure for installing support rails for the 2145-SV1 node.
Explains how to install the SAN Volume Controller 2145-SV1 node into a rack.
Details the installation of the cable management arm assembly for routing cables.
Guides on connecting the system to the SAN and Ethernet network.
Describes steps to verify the hardware installation after system setup.
Details how to install the 2U SAS expansion enclosure into a rack.
Guides on connecting 2U SAS expansion enclosures to the 2145-SV1 node.
Procedure for placing or replacing the 2145-92F enclosure in a rack.
Instructions for connecting 2145-92F SAS expansion enclosures to nodes.
Procedure to provide power to the 2145-92F expansion enclosure.
Procedure for powering down a 2145-92F expansion enclosure.
Ensures web browser compatibility and settings for accessing the initialization GUI.
Guides on initializing the system by connecting to the technician port.
Overview of requirements and tasks for adding nodes to a system.