Do you have a question about the IBM SAN Volume Controller 2147-SV1 and is the answer not in the manual?
General safety guidelines to follow when servicing the system.
Critical safety rules for working with electrical equipment.
Procedures for identifying and assessing potential safety hazards in the system.
Procedures for verifying the system's grounding continuity.
Overview of controls and indicators on the front panel for system status.
Details of the operator-information panel, including buttons and LEDs.
Explanation of LEDs on the rear panel indicating port, power, and connection status.
Essential preparation steps for the SAN Volume Controller hardware installation.
Tasks required to install a SAN Volume Controller 2145-SV1 node.
Procedure for installing the support rails necessary for the 2145-SV1 node in a rack.
Steps to install the SAN Volume Controller 2145-SV1 node into the rack after rails are installed.
Instructions for installing the cable management arm to route and secure cables.
Procedure for connecting the node to the SAN and Ethernet network.
Steps to verify the system installation after rack mounting and connections are made.
Procedure for installing support rails before mounting 2U SAS expansion enclosures.
Steps to install the 2U SAS expansion enclosure into the rack onto the previously installed rails.
Procedure for connecting SAS expansion enclosures to the SAN Volume Controller nodes.
Essential safety notices and guidelines specific to the 5U SAS expansion enclosure.
Information on handling the weight of the 5U SAS expansion enclosure and its parts.
Steps to initialize the system by connecting to the technician port and running the tool.